Migrate Your Legacy Private 4G/5G Network to BATS ECHO
Full-service migration from any legacy private cellular platform to BATS ECHO 4G/5G. We handle core switchover, SIM provisioning, end-device management, and everything in between — with zero coverage gaps.
Why Teams Migrate to BATS ECHO
Whether your vendor is sunsetting support or your network has outgrown its platform — we make the transition painless.
End-of-Life Equipment
Your current vendor is discontinuing hardware or software support. Migrate before you lose patches, spares, and service agreements.
Vendor Lock-In Escape
Break free from proprietary ecosystems with inflexible licensing, costly renewals, and limited interoperability.
Performance & Capacity Upgrades
Legacy platforms can't keep up with growing device counts, bandwidth demands, or edge compute requirements. ECHO scales with you.
CBRS & Spectrum Optimization
Transition to CBRS Band 48 or optimize existing licensed spectrum with modern RAN and dynamic spectrum management.
Consolidate Multi-Site Networks
Unify disparate private cell deployments across facilities onto a single, centrally managed ECHO platform.
IT/OT Integration Gaps
Your current network lacks the VLAN, VPN, edge compute, or API integrations your operations team needs. ECHO was built for it.
What the Migration Covers
Core Network Switchover
We migrate your EPC/5GC to BATS ECHO with parallel operation, so your old and new cores run side-by-side until cutover is validated.
- Full EPC/5GC migration with rollback capability
- Policy, QoS, and subscriber database transfer
- Zero-downtime parallel cutover
SIM & Device Management
Every SIM card, eSIM profile, and connected endpoint is reprovisioned, tested, and validated — scanners, tablets, routers, cameras, and IoT sensors.
- SIM reprovisioning or replacement
- Device-by-device configuration and testing
- Bulk onboarding for large fleets
RF Planning & Optimization
We don't just swap the core — we re-evaluate your RF environment to ensure coverage, capacity, and interference management are optimized on ECHO.
- Site surveys and propagation modeling
- Antenna placement, tilt, and power optimization
- Post-migration drive testing and validation
Backhaul & IT Integration
Your backhaul, VLANs, VPNs, and IT/OT integrations are carried over or upgraded as part of the migration.
- Fiber, microwave, Starlink, or cellular backhaul
- IPsec/WireGuard tunnels to DC or cloud
- SCADA, MES, VMS, and identity policy integration
Migration Specifications
Every migration is scoped to your network, devices, and operational requirements.
Assessment & Planning
- Full audit of existing RAN, core, and subscriber base
- Device inventory and SIM/eSIM profiling
- RF coverage analysis and gap identification
- Migration timeline and risk mitigation plan
Core & RAN Migration
- BATS ECHO EPC/5GC deployment and configuration
- Parallel core operation with automated failover
- RAN repointing or replacement (CBRS B48 / licensed)
- QoS, policy, and subscriber database migration
Device & SIM Transition
- SIM reprovisioning, replacement, or eSIM push
- End-device reconfiguration and APN updates
- Per-device connectivity and throughput validation
- CPE, router, and gateway firmware alignment
Validation & Handover
- End-to-end network testing and drive surveys
- Performance benchmarking against legacy baseline
- Staff training and documentation handoff
- Transition to ongoing managed service (optional)
Migration Packages
Essential Migration
Core switchover, SIM reprovisioning, and basic device onboarding for single-site networks.
- Best for small, single-site deployments
- Typically complete in 2–3 weeks
Full Migration
Multi-site core and RAN migration with full device management, RF optimization, and parallel cutover.
- Best for campuses and multi-facility operations
- Phased rollout with zero downtime
Enterprise Migration
Large-scale, phased migration with dedicated project management, custom integrations, and ongoing managed service.
- Best for complex, mission-critical networks
- Dedicated PM and 24/7 support included
FAQ
Common questions about migrating to BATS ECHO.
How long does a typical migration take?
Most single-site migrations complete in 2–4 weeks. Multi-site or complex integrations are phased to minimize disruption, with timelines scoped during the initial assessment.
Will there be downtime during the switchover?
We design every migration for zero or near-zero downtime. Parallel operation of old and new cores allows a seamless cutover with instant rollback capability.
What legacy systems do you migrate from?
We migrate from all major private LTE/5G platforms — including Nokia, Ericsson, Samsung, Baicells, and other CBRS or licensed-band deployments.
Do you handle SIM cards and end devices?
Yes — we manage the full device lifecycle: SIM reprovisioning or replacement, device configuration, testing, and validation across all connected endpoints.
Ready to Migrate Your Private Cell Network?
Tell us your name and email. We'll follow up to scope your migration and provide a tailored quote.
By submitting, you agree we may contact you about BATS Wireless products. We don't sell your data.